Galvanized structure steel with 220mm thick arc panel over what will be the 25m heated indoor swimming pool at Ball Park Corowa was a big talking point last week. And tomorrow or Friday will see the pouring of the slab for the administration building.
Hold tight - we’re checking permissions before loading more content